Here are some before, during, and after photos of a hardwood project we recently completed in Golden Valley. We had to do a lot of demo; including removing carpet, parquet wood, and old sheet vinyl. Then we tore out the old particle board subfloor and replaced it with 3/4 plywood so we would have a stable subfloor to nail into. Once we had the demo and prep work completed, we could install the new 3/4 x 3 1/4 Bruce Waltham plank floor. The last piece was to move all the furniture back in place.

Before:

living room before

kitchen before

dining room before

After:

living room after

kitchen after

dining room after